Skip to main content
Translate
Default
English
Español
Français
Deutsch

UP TO THE MINUTE

Por John Kenney, traducido por Alberto Torres. La seguridad no depende ...
By Emma Peterson. NFRC is calling on roofing companies to ...
Read More
IKO -  - Dynasty
IFD - Building Roofing
NFRC - - Weather the Storm
Translate
Default
English
Español
Français
Deutsch
Roofing Around the World
Starts in
04 days 23 hours 50 minutes 23 seconds
Learn More

DECRA Project Profile: Presbyterian Lodge

JUN - ProjProfile - DECRA Presbyterian Lodge
June 29, 2018 at 4:02 p.m.

To decrease the stress on the roof’s truss system and structure, a lightweight product was needed and DECRA Shake fit the bill.

Opened in 1914, the Presbyterian Camp and Conference Center Lodge has served generations as a bible camp and retreat. Built on the shore of a 6200-acre lake at an elevation of 6700 feet in Big Bear Lake, California, the Main Lodge Building required a major renovation and re-roof of its existing aluminum panel roof after years of damage from the harsh mountain weather.

Construction practices dating from the early 1900’s led the architect, Lem Bottoms, to conclude that any disruption of the existing layers of redwood shingle and composition shingle could result in expensive or irreparable damage to the building substrate. After careful analysis, it was determined that the best solution was to remove the aluminum roofing material, leave the redwood and composition layers, and roof over those layers.

To decrease the stress on the roof’s truss system and structure, a lightweight product was needed. DECRA Shake made this a viable option. Weighing 125 pounds per square, DECRA Shake is lightweight but durable. Bottoms was confident that the DECRA Roofing System would withstand the heavy snow load and extreme freeze/thaw conditions common to the area.

Bottoms was also certain the system would perform against the high winds that come off the lake. Because of the unique interlocking design, DECRA panels have a 120-mph wind warranty, and have been tested to a velocity of 150 mph.  Aesthetically, Bottoms and the church committee felt the DECRA Shake would enhance, yet maintain, the rustic appearance of the lodge building.

Project: Presbyterian Camp/ Conference Center Lodge

Location: Big Bear, California Challenge(s): Finding a lightweight product to roof-over two layers of existing material; durable enough to withstand the harsh mountain weather.

Solution: DECRA stone coated steel product – lightweight and durable.

Profile: DECRA Shake

Learn more about DECRA and their Jump Start program where contractors can earn up to $5,000.



Recommended For You


Comments

There are currently no comments here.

Leave a Reply

Commenting is only accessible to RCS users.

Have an account? Login to leave a comment!


Sign In
Cotney Consulting Group - Banner Ad - November 2026 2-Day Live Classroom Training - September 2026
Translate
Default
English
Español
Français
Deutsch

UP TO THE MINUTE

Por John Kenney, traducido por Alberto Torres. La seguridad no depende ...
By Emma Peterson. NFRC is calling on roofing companies to ...
Read More
NFRC - - Weather the Storm
IFD - Building Roofing
IKO -  - Dynasty