Skip to main content
Translate
Default
English
Español
Français
Deutsch

User Access


IKO -  - Dynasty
All Weather Insulated Panels -  Ad - GlimpseXR
NFRC - Climbing the Ladder -
Coffee Conversations
Translate
Default
English
Español
Français
Deutsch

Nailing deck through secondary water barrier?

« Back To Roofers Talk
Author
Posts
September 17, 2018 at 9:40 a.m.

chazbow

I recently had a new roof installed in South Florida with Owens Corning Weatherlock peel and stick water barrier and Duration shingles. After I had a wind mitigation inspection we discovered the deck was not renailed with #8 ring shank nails every 6" per code. The roofer admitted they may not have renailed the entire roof and want to tear off some of the shingles and nail through the secondary water barrier and then replace the shingles.

My question, is it advisable to nail the deck through the secondary water barrier? Is it even possible to remove the peel and stick without damaging the deck. What are your opinions on fixing this so it meets code and passes wind mitigation.

Thanks for reading


« Back To Roofers Talk
You must be logged in to reply to this topic.

Sentry Building Innovations - Banner - AnchorDeck Classic
Translate
Default
English
Español
Français
Deutsch

User Access


IKO -  - Dynasty
NFRC - Climbing the Ladder -
All Weather Insulated Panels -  Ad - GlimpseXR